Yu Wan Ministry of Transportation highway is two vertical and two horizontal Ninth Five-Year Plan in Chongqing, Shanghai-Chengdu highway section in its territory, from the starting point on the bridge in Chongqing, Wanzhou District end to Qinggang pounds. A total length of 266 km, the design speed of 80 km, six-lane is 32 km, and the remaining 234 kilometers of four-lane. Yu Wan Expressway via Changshou District, Dianjiang County, Liangping County, the basic direction along the Yangtze River, along with a Yanggongqiao, I Chichiawan, and, boy yard, yanjia, Peach Street, Hop Hing, PTZ, Cheng Creek Dianjiang, Zhou Jia Yunlong, Liang Ping, Sun, watershed and more than a dozen pounds Qinggangpo Zuozuo interchange. Construction in two phases, a project from the bridge to the Peach Street Changshou District, a total of 85 km, at 28 April 2000 was opened to traffic; Phase II project from Peach Street to Changshou District Wanzhou District Qinggang pounds, 181 km long , on December 12, 2003 was opened to traffic. |
|
|