Olympic Water Park, Rizhao City Tourist Complaint telephone complaints Tel :0633 -8,816,276 Shandong Tourism complaints Tel :0531 -82,963,423 National Tourism complaints Tel :010-65275315 Olympic Water Park, Rizhao Rizhao City is by far the largest one-time investment to build the largest relocation of households most urban construction projects. Rizhao City Planning Commission has discussed the Water Park of landscape design and garden construction monomer, Wanpingkou bridge and slalom design. Lighthouse Park from south to north from the Plaza, the World's Cup base, Wanpingkou ecological Square and water sports base in four parts. Currently, Wanpingkou ecological Square, the World's Cup base part of the landscape and square have been built lighthouse open to visitors.
Translated by Google
Related Information
Venue: Shunyi Olympic Rowing-Canoeing Park Location: Shunyi District, Beijing Beixiaoying Chaobai River Site Type: New stadium Purposes during the Olympic Games: Rowing, canoeing (hydrostatic), slalom, marathon swimming Use during the Paralympic Games: Rowing Building Area: 31,850 m2 Holder digits: 1200 Temporary seats: 25 800 (stand seats 10,000) Construction start: 2005 first half Delivery and acceptance: July 28, 2007
Translated by Google
Details
Shunyi Olympic Rowing-Canoeing Park Shunyi Olympic Rowing-Canoeing Park in Shunyi District Chaobai sunny east coast of Beixiaoying gate, Sun Palace Bridge from the city come along Chengde Road, White Horse Bridge Gaoliying exports, specifically for the stadium to see the construction of Olympic Boulevard - the white road. 16 km from the straight white road, with direct access to water park. The park covers an area of 302.7 hectares. Beijing 2008 29th Olympic Games, rowing in the Olympic Water Park. Olympic Water Park, the scale of planning and construction of 20,000 square meters, total investment estimated at about 756 million yuan. Shunyi District People's Government to be determined through a public tender the project legal person responsible for the financing of the Olympic Water Park design, construction, maintenance (including routine maintenance and facilities are due for replacement) and operation; the project will get the project up to not more than 30 years franchise. After the Olympic Games venues will be used for domestic and international sports competitions and training, and public sports and recreational activities. After the completion of the development to meet the country's first water sports rowing, slalom, water skiing and other major items of 8 114 small items in the game, will be the host of water sports can be up to the venue, but also with international standards of tourism and leisure attractions. Shunyi Olympic Rowing-Canoeing Park signs in the traditional Chinese brush lines sketched out, reflecting the strong Chinese cultural heritage, the use of color on the color of the five Olympic rings, a symbol of ancient oriental civilization and the perfect combination of modern Olympic spirit. Logo image as a variant of the water body of athletes, both with back-end image of the water characteristics of rowers, but also has a two-hand paddle water kayakers image characteristics, the central blue-green water projects more prominent watermarks features. "Shunyi 2008" uses the same font type movement, highlighting the project's host and hold time. Dynamic distinctive throughout the composition, with a strong sense of movement. Composition, the red stripes to "shun" the word Pinyin consonant "s" variant, with yellow stripes and together constitute the "righteousness" Pinyin consonant "y" variant, also black, red, and yellow together constitute Chinese character "meaning." Blue and green stripes below the Shunyi Olympic Rowing-Canoeing Park and a symbol of Chaobai Forest Park near each other, _set_ off each other, forming the "river-based water as soul, Lin Yun," the new Shunyi city heritage, step by step up Watermark and "shunyi 2008" text composition while clutching a symbol of people's Shunyi Olympic opportunity in building a socialist harmonious society and the "concentric comprehensive construction well-off, to create green international port" on the road, carry forward the "concentric progressive, scientific innovation , down to earth, the pursuit of excellence "Shunyi spirit, and constantly develop and advance, uplifting the spirit.
Translated by Google
Water Park
Park construction highlight the "Water" character. From the wide entrance into the South Park, greeted by the broad plaza, a fountain located in the middle of the splash. Square both sides of the water sports on both sides to fully reflect the characteristics of the decorative wall, above the rowing and canoeing athletes are struggling to match the scene. If you have sufficient time in the park turn on the lap, then you will certainly find more and water, and water sports-related things. Such as the diaphragm in the rowing and canoeing field field in the middle of the bridge, the two sides of the bridge arches of varying height, the wave shape, even on the bridge floor tiles are also in the same style paved. There the administration of FISA and athletes rowing boats parked in the reservoir area, both with a curved architectural style, both like the water thrown up by waves, but also like a move forward but also a unique canoe. It is worth mentioning that the park lights, they are in terms of both style and shape, or "water" is full of associations. Main road on both sides of the street up to five meters, a variety of colors hanging from the flagpole "Good Luck Beijing" banner, the top five or six is a small arc to spread around, a symbol of scattered spray. The leading boats in the reservoir area of the side of the road, is the third year of a small street meters, they are the same shape and the main street, just short of a few drops of "spray." In such venues the game so that every athlete is relaxed and happy, according to Belgian Clara Frank Adams again and again in an interview with the "great" and "too pretty" to describe the Shunyi Olympic Rowing-Canoeing Park. " This is the biggest I've ever seen, the best rowing venues, me and my teammates are very pleased to be participating in such a good venues. "
Translated by Google
Wearing "a smile circle" the most beautiful of volunteers
Olympic Park, the scenery is beautiful, but more beautiful are those hard-working volunteers. They dressed in orange t-shirt, wearing a yellow "smile circle." In the middle of the channel next to the boat in the reservoir area has a small red pavilion, a brand of ground vertically, using a variety of languages that can get here what kind of language assistance, including French, Russian, Czech, Italian, Spanish, English and other eight. "This is the language service kiosks," from the French Department of Beijing Foreign Studies University, Qian Zhao Ye explains, "We are a total of 18 individuals served here are from the same school in which English has four, two other languages are Each hour there will be two on duty at the kiosk yard, and then the other students in a small office next to the stand. "
Translated by Google
Information
In November 2006, Shunyi Olympic Rowing-Canoeing Park to complete the first phase of 300,000 cubic meters of water task. It is reported that the venue will require a total storage of about 1.7 million cubic meters, divided into three stages, in late December to complete all the water.